Cedar Hills Landfill CAT Shack Evaluation & Design

Integrated Design Engineers performed an assessment of an existing landfill “CAT shack” building to determine whether King County could reuse, relocate or remodel the structure. idE also provided a comparative cost estimate study for two options: constructing a prefabricated building on a new foundation designed by Integrated Design Engineers, or remodel the existing building and move it to a new location at the landfill. 

 

 

 
 

Project Team

Owner: King County Solid Waste
Prime Consultant: Rolluda Architects
Location: Maple Valley, Washington